CELIT 4D PDF

Celit 4D. Done. Comment. views. 0 faves. 0 comments. Taken on August 20, Some rights reserved. Flickr is almost certainly the best online photo management and sharing application in the world. Show off your favorite photos and videos to the world, securely. Détail pieds de mur 1 Lattage vertical 22/45 2 Celit 4D 23mm 3 structure en bois mm FJI 45/ 4 latte inférieure en Kerto 27/ 5 poutre / 6 plat en.

Author: Meztigar Zulutaxe
Country: Peru
Language: English (Spanish)
Genre: Spiritual
Published (Last): 10 February 2010
Pages: 406
PDF File Size: 4.29 Mb
ePub File Size: 15.5 Mb
ISBN: 768-9-35617-644-6
Downloads: 70225
Price: Free* [*Free Regsitration Required]
Uploader: Kazraran

Schrijf u in op onze nieuwsbrief en ontvang periodiek info over onze producten, info over opleidingen en nieuwtjes.

Roof ventilated construction – BFirst

General principle of the placement of one panel Inserting a panel in the top rail The placement of the EPDM joins Additional Cwlit joins are placed to avoid movement by strong wind. The modules are slided in the horizontal profiles and fixed with the use of EPDM joins:. Also the openings on both sides of the cavity need to be big enough otherwise they will hinder the airflow or even stop it. Building physics The most important difference between both types are the physic aspects.

Installation of the modules After the framework is installed, we start placing the modules. Installation of profiles on the roof The vertical profiles are place on top of the beams to have maximum strength.

The Celit 4D roof is too soft for that.

Celit 4D | Peter Steen en CO | Flickr

A schematic overview of the construction is given next: This guideline shows the practical aspects and experience from the installation. Bio-ecologische houtbouw- en isolatiematerialen, deskundig advies voor vakman en consument Bezoek onze webshop.

  GOLFUL FRANCEZULUI PDF

Omega profiles The omega profiles are manufactured on demand by the celif Facozinc based in Gilly Belgium. Roof layers The construction is built up in different layers: Then the Omega profiles are placed in between two roofing shingles in order to collect the rain water that will flow in the space between the modules. Webshop Koop ons uitgebreid aanbod bio-ecologische houtbouw- en isolatiematerialen online! The vertical distance between 2 ALUTEC RL profiles is of the highest importance because this space must allow celir the panel but must also make sure that the panels will be difficult to remove by the wind.

Nevertheless, the components, materials and their installation process may vary in different cases, thus the information provided in this document should be handled with care, adjusting the installation with regard to the existing roof composition in each case.

De Steico Joist-ligger met flenzen is geschikt voor dakconstructies, roosteringen en vervanging van betongewelven in metselwerk.

This is an h1 heading

This means that the watertight layer has a ventilated cavity under it. In this Belgium demo building we demonstrate the RS02 solar roof elements.

Door een zeer grote marktvraag naar houtbriketten en -pellets zijn de Ecopower houtbriketten niet meer leverbaar op korte termijn. Heeft u vragen over d4, een project of levering?

Vul hier het contact formulier in en we contacteren u zo spoedig mogelijk.

The cflit of this guideline is not focused on the installation process ce,it the BIPV modules, but the construction process of the substructure needed to install them.

The vertical profiles are place on top of the beams to have maximum strength. More detailed, the vertical profiles are mounted with screws over the wooden profiles and the Omega profiles on the roof surface alternately every 70 cm. The mounting of the horizontal profiles on the vertical ones is done by the retaining clips, as shown in the picture below.

  INTRODUCING PHONOLOGY ODDEN PDF

Special xelit Three types of profiles: Traditional roofs with tiles are ventilated roofs. A schematic overview of the construction is given next:. In order to avoid any risk of removal of a panel due to the wind, it is proposed to place an additional join T join.

Start at the lower end of the module array. The profiles can easily screwed in the wooden bat.

The figures below show the positions and number of these profiles. Vertical and horizontal mounting rail. Not all roofs have this construction.

The construction of the cavity needs enough space at the lower and the upper part of the roof.

The most important difference between both types are the physic aspects. The efficiency of PV cells is influenced by the temperature of the cells. Eurabo cvba gebruikt cookies om uw surfervaring op deze website te verbeteren.

Examples of non-ventilated asphalt shingle and ventilated tiles roofs. The omega profiles are manufactured on demand by the local company Cellit. Additional T joins are placed to avoid movement by strong wind.

The pictures below present the general principle of the module placement. The modules are slided in the horizontal profiles and fixed with the use of EPDM joins: Ventilated roof of the demo house in Mons B. In 4r Belgium demo building we demonstrate the RS02 solar roof elements.